Year 10 (ages 14–15, Grade 9 in the US) · Geography · GCSE physical geography · Lesson 14
River flooding and flood management
Physical and human factors that increase flood risk, how to read a flood hydrograph, and hard and soft engineering strategies for managing river flooding, with their costs and benefits.
Exam boards: this lesson matches the AQA GCSE geography courses. Check which course your school follows.

8-minute video lesson
Teaching, worked examples and 20 practice questions solved step by step.
Watch free for a monthWhat your child will learn
- Explain physical and human causes of flooding
- Interpret a flood hydrograph
- Describe hard engineering
- Describe soft engineering and evaluate strategies
The method
- Causes: physical (rain, geology, slopes) and human (urbanisation, deforestation).
- Hydrograph: rainfall bars, discharge line, lag time.
- Hard: dams, embankments, channel straightening, relief channels.
- Soft: warnings, zoning, planting trees, river restoration.
Key words: hydrograph, lag time, peak discharge, impermeable, flood plain zoning.
Worked examples
Worked examples from the lesson, with every step.
Question 1
Explain how urbanisation increases flood risk.
- Step 1: Concrete and tarmac are impermeable.
- Step 2: Drains carry water quickly to rivers → shorter lag time.
Answer: more surface run-off reaching the river faster
Question 2
Peak rain at 10:00; peak discharge at 16:00. Find the lag time.
- Step 1: 16 − 10
- Step 2: 6 hours
Answer: 6 hours
Question 3
What does a short lag time suggest?
- Step 1: Water reaches the river quickly.
- Step 2: Higher flood risk.
Answer: a higher flood risk